News

10 May, 2021

Proesza, awarded the contract for the control and auscultation services of the Montearagón dam (Huesca).

The contract is for the following: “CONTROL AND MONITORING OF THE DAM AND SLIPPING I-13 IN THE RESUMPTION OF THE SECOND STAGE OF THE LOADING OF […]
10 May, 2021

Emergency works awarded to repair damage in the Ebro basin.

During this month of June 2018, the second phase of the emergency works for the repair of damage as a result of the storms and floods […]
10 May, 2021

World’s longest bridge opens in June

From Proesza we echo this news appeared in several media. China inaugurates in June what will be the longest bridge in the world, with a length […]
10 May, 2021

Placement of the first gate in the Tudela works.

On April 5th, the first floating floodgate has been placed at the mouth of the river Queiles in the town of Tudela, where PROESZA is the […]
10 May, 2021

The emergency works of the CHE for the repair of riverbeds have begun.

Last September, the second phase of the emergency works for the repair of riverbeds that were affected by the floods of April 2018, which affected several […]